Skip to main content

Tag: Tom Woodard

Woodard leaving Bradenton Beach

Woodard leaving Bradenton Beach

BRADENTON BEACH – With the city officially announcing the resignation of Public Works Director Tom Woodard at a May 2 commission meeting, it was also announced that Police Chief John Cosby will fill in as interim department head during the search for Woodard’s replacement.

Woodard, who has been with the city for 20 years, is taking a job as Public Works Director in Bedford, Virginia.

Mayor John Chappie said on May 3 that Woodard’s last day with the city will be sometime this month.

Woodard, a lifelong Bradenton resident, said the move has been a family decision.

“I wanted to make a change primarily for my wife and two daughters,” he said. “This has nothing to do with Bradenton Beach. I respect and love everyone here.”

The news of Woodard taking the new position was announced by Bedford in an April press release. He was one of 40 applicants for the position there.

“I’ve been here for 20 years. I’m a little nervous about it, I didn’t want to hurt anyone’s feelings. The town there issued a press release before I spoke to anyone here. I sent an email to the mayor, the commissioners and to my staff,” Woodard said.

The press release stated in part: “Throughout his distinguished career, Woodard has managed a wide range of departmental responsibilities and played a pivotal role in municipal operations, especially in emergency management, including the effective removal and disposal of debris following hurricane damage.”

According to the release, Woodard’s career spans over three decades, starting in Manatee County, where he served as a traffic management supervisor for eight years. He is a graduate of Manatee Community College and holds several professional certifications, including from the National Incident Management System.

A modest Woodard said he didn’t want to make a fuss, but when pressed to say what has been his proudest accomplishment, he said it is being part of a team in emergency situations.

“What I’m most proud of is the emergency management team,” Woodard said. “The chief (Cosby) is the incident commander, and I’m number two, we handle debris removal to get the island open. My department is boots on the ground first responders with police. My staff is a group of talented people.”

He said Bradenton Beach sets the standard for storm response.

“Because of the way we operate, the city gets FEMA money back. Shayne Thompson is part of our three-man team who takes on the FEMA aspect,” Woodard said. “We are the only city I know of, maybe in the state, that gets 90-100% reimbursement from FEMA. The chief has been doing this for 40 years, I’m 30 years, it’s great how well we work together to get people back into their homes quickly after a storm.”

Woodard attributed the teamwork among city departments as a contributing factor in the city’s progress.

“Here in Bradenton Beach, it’s always a team effort,” Woodard said. “The chief and mayor are very involved. Ricinda (City Attorney Ricinda Perry) is there for legal support, and when a job goes out to bid the city clerk (Terri Sanclemente) is involved as well as the building official (Darin Cushing.)

Among other large projects, Woodard has been involved in the rebuilding of the city pier and the roof of the Anna Maria Oyster Bar building.

“Tom is looking at working with the chief to make sure he has what he needs,” Perry said. “I plan to meet

with Tom to go through the list of things the chief needs to effectively take that department forward and make sure the city is well-serviced and also for us to make sure we have a list of emergency projects before he leaves our city and helps set up a game plan.”

The commission voted unanimously to approve Cosby’s salary increase of $850 a week while serving as interim public works director.

The search for a full-time public works department head to replace Woodard will likely take place in July.

“We feel it’s important we write a very good advertisement for that position, and it’s going to take a little bit of effort because we’re not entirely sure of everything that role entails,” Perry said, noting the position has certification and reporting requirements.

“I would hope we would be able to advertise by July and maybe by the second meeting in August bring back recommendations,” Cosby said. “You have to remember also I have to do budgets for all the departments. It’s not just maintaining the day-to-day operations. I have to do their payroll, I have to pay their bills and develop the budget.”

“I don’t think it will be that easy to find someone with Tom’s qualifications,” Commissioner Ralph Cole said. “He’ll be missed.”

“This is another example of the employees working as a team,” Cosby said. “You have someone who can step in because we do work so closely together.”

FDOT sidewalk project concerns Bradenton Beach officials

FDOT sidewalk project concerns Bradenton Beach officials

BRADENTON BEACH – City officials share some lingering concerns about the permeable brick paver sidewalk the Florida Department of Transportation (FDOT) is installing along Gulf Drive.

The concerns include potential safety and tripping hazards and the city’s future liability and maintenance responsibilities.

Funded and supervised by FDOT, the sidewalk project calls for the replacement of the existing concrete sidewalk along Gulf Drive North, from Ninth Street North to the s-curve near the south end of Avenue C.

The larger, permeable pavers being used for the FDOT sidewalk project are approximately a foot thick and are much thicker than standard-sized brick pavers. It’s hoped the thicker pavers will provide greater stability and durability alongside the heavily traveled state road and state-owned right of way.

FDOT sidewalk project concerns Bradenton Beach officials
In May, a comparative example of the larger-sized brick pavers (on the left) was provided to city commission members. – Joe Hendricks | Sun

According to the post-project maintenance agreement with FDOT which Mayor John Chappie, City Clerk Terri Sanclemente and City Attorney Ricinda Perry signed in September 2020, the city will be responsible for the future maintenance of the FDOT-installed sidewalk.

According to the agreement, “It is understood and agreed by the parties that upon completion of the project, the local agency (the city of Bradenton Beach) shall be responsible, at its costs, for maintenance of said project. Maintenance items to be maintained by the local agency shall include, but not be limited to: removal of graffiti, pervious pavers and aesthetic features. The local agency shall maintain pavement surfaces free from residue accumulation, algae, vegetation and other slip or trip hazards. The local agency shall sweep, vacuum, edge and provide weed control along the project corridor from 10th Street to Avenue C, only at the permeable brick paver locations. The local agency shall ensure the safety of the public by repairing shifted pavers and maintaining the permeable brick pavers and any other safety features within the project corridor. The local agency shall maintain and repair the permeable brick pavers at its sole cost and expense, in a good and workmanlike manner and with reasonable care.”

Before entering into the agreement with FDOT, the mayor, city commissioners, public works director and city attorney expressed concerns about the use of the oversized pavers and the ongoing maintenance responsibilities and costs to be incurred by the city.

Chappie addressed the city’s ongoing concerns during the Thursday, Oct. 7 city commission meeting.

“It’s not what we expected. We don’t really have high expectations of how successful it’s going to be. We have put FDOT on notice of our grave concerns with regards to safety, the tripping hazards and how it’s being installed. We don’t want to increase any extra liability on our city for something FDOT is doing,” Chappie told the commission.

“I worry about pavers. You are going to trip on pavers. They can’t be even all the time,” City Commissioner Jan Vosburgh added.

“It’s their right of way, their sidewalk,” Chappie responded.

FDOT sidewalk project concerns Bradenton Beach officials
Mayor John Chappie is among those concerned about the new sidewalk being installed by FDOT. – Joe Hendricks | Sun

Chappie noted Public Works Director Tom Woodard had communicated the city’s concerns to FDOT officials. Woodard emailed FDOT Construction Project Administrator Chris McInnis on Monday, Oct. 4.

“I just wanted to touch base with you about the sidewalk replacement/brick installation project, as a few concerns with the installation have been brought to my attention. I just need to be sure that correct installation oversight and inspection is taking place? The brick appears to be wavy with some potential trip hazards. I’m sure the abundant groundwater and with the weight/size of the bricks it makes for a difficult installation, but we need to be sure we get the best end result possible,” Woodard stated in his email.

In the response he sent Woodard that day, McInnis wrote, “The installation of the pavers are being installed per plan and manufacturer specifications. The contractor is doing their best to provide a quality product. The contractor and I have been working close together in making sure that all the concerns of the department, county and Bradenton Beach are mediated. Any and all concerns regarding the safety of the finished product will be addressed.”

After receiving a copy of that email exchange, Chappie sent Woodard an email that said, “Thanks for putting FDOT on notice of our grave safety concerns. This type of design, using blocks, have inherent challenges with installation. Thanks for staying on top of this project.”